Tag Archive for: columbus

Marble Cliff

U.S. Bridge recently completed our construction of a steel bridge for the Marble Cliff development in Columbus, Ohio. The steel truss bridge serves as a centerpiece for the new mixed-use development just five miles from downtown Columbus.

The weathering steel truss bridge spans 80-feet, with a 28-foot clear roadway, and two eight-foot sidewalks for pedestrians.

Marble Cliff

The Marble Cliff Development

Since the fall of 2018, we’ve worked closely with the site’s developer Thrive Companies. Together, we determined that the new development required a signature entrance.

As with every project, we collaborated with the client to decide on the elements the bridge needed. It was without question that the development deserved an aesthetically-pleasing bridge entrance match the luxury of the ongoing development.

We presented many options and ultimately landed on a weathering steel truss bridge, which included railings and a concrete floor.

The development is located on former quarry land in Columbus, Ohio. The mixed-use development of 70 acres will contain 864 housing units and 80,500 square feet of office and retail space. Specifically, the new housing is targeting professionals and young adults.

In addition, the Marble Cliff development will incorporate linked waterways, including streams and ponds, for residents to enjoy. Thus, the bridge is accessible via the waterways that kayakers and canoers can use near the Scioto River.

Marble Cliff

The Bridge Construction Process

We discussed the bridge needs with the Marble Cliff development’s on-site land contractor, developer, and consultant. After discussions about the project scope, the developers put their trust in U.S. Bridge to engineer, design, manufacture, and construct the bridge.

Once the scope was determined, we proceeded with our design of the truss bridge. We reviewed the project details carefully to ensure it met the client’s specifications and maintained U.S. Bridge’s high-quality standards. After approval and construction of the abutments, our team installed the bridge, concrete floor, and necessary railing.

Through every step of the process, we worked with Thrive Companies to meet and exceed expectations.

Without delay, we completed the bridge project on time and on budget. We are pleased to be part of this bridge project that will serve the Columbus community for generations to come. Now that the bridge is in place, the former quarry can continue to move toward its completion.

Marble Cliff

A Team Effort by U.S. Bridge

Every part of our team at U.S. Bridge touched this project. From engineering and design to steel fabricators to the construction team, our team showed what great work we can do together.

We are glad to be a part of this redevelopment, located on 70 acres near the Scioto River. By and large, this project was a great success for the U.S. Bridge team.

To learn more about why we’re the leader in steel bridge construction, get in touch with us. We’re glad to answer any questions about your bridge construction project.